30.05.2016
Hydroinvest has signed a contract for preparing geological engineering documentation for the newly designed municipal waste incineration plant in Ruda Slaska.
Geological survey in the area of the prospective structure has just commenced. We are facing and interesting and difficult challenge during the geological survey process for this post-mining territory.
Geotechnical survey will become the basis for performing calculations for the enforced concrete foundation structure of the incineration plant.
3D modeling and design will be used in the course of the works to enable better preview of the projected facility.