od 16.01.2023 do 23.01.2023
Augustow Canal Locks Restoration Project.

Hydroinvest Sp. z o.o. carried out construction and detailed designs in connection with the task " Technical documentation for the renovation of the Locks on the Augustow Canal: Przewięź, Kudrynki".