od 15.02.2016 do 31.05.2016
Lipki Small Hydroelectric Power Station
The deliverable was a detailed design for the Lipki Small Hydroelectric Power Plant
The designed HPP is located on the right bank of the inter-embankment zone in the area of Bystrzyca, Olawa Commune. The HPP is to be raised on a floodplain.
The Lipki Barrage is located at 206.7 km down the Odra River, on an trained section of the river.
The Project aims to raise the HPP near the existing Lipki Barrage on the Odra River.
Investor: INECO
Location: Lipki
Period: 2015 – 2017