od 01.02.2017 do 15.11.2017
Municipal Water and Sewage Company
RECONSTRUCTION OF BAY NO. 2 AND THE VERTICAL Wharf, along with an access road, and adaptation of the service of water intakes and floating facilities at the river pumping station of the central water supply plant in Warsaw
The subject of the investment was the reconstruction of bay no. 2 and the vertical wharf together with the access road, as well as the adaptation of water intakes and floating facilities serving them.
As part of the reconstruction of Bay No. 2, it was deepened to the ordinate of -2.5 m in relation to "0" MPWiK, the existing reinforced concrete wall was replaced with an anchored steel wall topped with a reinforced concrete cap, mooring devices as well as power connections were installed. The aim of the investment was the reconstruction of Bay No. 2 used for mooring equipment used for exploitation and the reconstruction of water intakes.
As part of the reconstruction of the vertical quay, the reloading yard was rebuilt, the surface of the existing access roads from the side of the flood embankment slope was renovated, mooring facilities were built on the designed quay, as well as electricity connections were built. The aim of the investment was the reconstruction of the vertical wharf used for transshipment of materials used for the construction, operation and renovation of water intakes.
Location: ul. Czerniakowska 106/124
Investor: MPWiK
Principal: PORR S.A.
Date: 2017