od 20.03.2019 do 12.06.2021
Small Hydroelectric Power Plant Wróblin on the Odra River.
Executive project „Small Hydroelectric Power Plant Wróblin on the Odra River with the obtained power of 1.7 MW” by Hydroinvest commissioned under PORR S.A.
od 20.03.2019 do 12.06.2021
Executive project „Small Hydroelectric Power Plant Wróblin on the Odra River with the obtained power of 1.7 MW” by Hydroinvest commissioned under PORR S.A.