od 07.02.2019 do 26.05.2021
Small Hydroelectric Power Plant Zwanowice on the Odra River.
Executive project „Small Hydroelectric Power Plant Zwanowice on the Odra River” by Hydroinvest commissioned under PORR S.A.
od 07.02.2019 do 26.05.2021
Executive project „Small Hydroelectric Power Plant Zwanowice on the Odra River” by Hydroinvest commissioned under PORR S.A.